Home pageLogin
ideas-4-pets ideas-4-pets ideas-4-pets ideas-4-pets ideas-4-pets ideas-4-pets
ideas-4-pets
The UK's largest range of top quality discount pet housing, pet products & garden Buildings. All our prices include VAT and delivery so the price you see is the price you pay
free delivery
deliverycagebuttontestbuttoncontactbutton













New Products ...
Featured Products ...
For Telephone sales/ Advice ring 0870 6073474

Monday-Friday 9.00am-6.00pm

Saturday-Sunday 10.00am-3.00pm
Visa payments supported by WorldPay Visa/Delta payments supported by WorldPay Visa/Electron payments supported by WorldPay Mastercard payments supported by WorldPay Solo payments supported by WorldPay Maestro payments supported by WorldPay
Protx

Hawklok

How many Hawklok tiles do I need ?

Guide below inidicates how many tiles to purchase for a base for a shed.

4' x 6'   shed requires 6 tiles and  2 pegs
4' x 8'   shed requires 8 tiles and  3 pegs
6' x 8'   shed requires 12 tiles and  6 pegs
6' x 10' shed requires 15 tiles and  8 pegs
6' x 12' shed requires 18 tiles and 10 pegs
8' x 10' shed requires 20 tiles and 12 pegs
8' x 12' shed requires 24 tiles and  15 pegs

The tiles are also suitable for summerhouses, log cabins, play houses and many other garden buildings

How to use Hawklok

  1. The chosen site need be only reasonably firm, but level. Cut grass, remove high spots and/or dig to required level. Basic tools only required - spade, spirit level and rake.
  2. Once the chosen site is prepared, lay down the Weedex membrane. In windy conditions peg or weight down the Weedex membrane.
  3. Layout the required number of grids, 6 for a 6'×4' (1.8m × 1.2m) building, 12 for a 8'×6' (2.4m × 1.8m) building. Once 4 corners of the grids are together a locking peg can be pushed into place or place all grids down and finally lock in place.
  4. Each grid is symmetrical. The locating lugs sit one on top of the other. Simply place the first grid and check the position of the locating lug. The next grid's locating lug will be its opposite. The locking peg will ensure all are correct.
  5. With all grids in place, the HAWKLOK base is now ready for your garden building to be erected as per the manufacturer's instructions.
  6. After your garden building has been built, if required, trim any excess Weedex membrane with a knife.
  7. Your fully completed garden building is now ready to use.

 

Continue
Registered in England: VAT N0: 856 8202 07
Built and hosted by Ilkley IT Services